Water

Site Visit to Thames Gateway Water Treatment Works (Desalination Plant)

Site Visit to Thames Gateway Water Treatment Works (Desalination Plant)
  • Date From 14th March 2019
  • Date To 14th March 2019
  • Price From £25.00
  • Location Beckton Sewage Treatment Works Main building, Jenkins Lane, Barking, IG11 0AD

Overview

The Water Special Interest Group have organised a day's visit to Thames Gateway Water Treatment Works. The event provides an opportunity to learn about the desalination process and network with plant designers and operators during a walking tour of the facilities.

In the morning, Martin Currie, Water SIG Chair and Laura Lopez Gomez, Production Manager will introduce and commence the tour around the site. Long walks during the tour will be used for networking and general Q&A. After lunch, Brian Moore, the Technical Lead for the project will present on the design, pilot testing and commissioning of the plant. Mike Bedford, an asset condition/risk engineer at Thames Water will present on the operational challenges the site faces. The day will conclude with an open discussion on “Lessons Learned” and “What We Would Do Differently” chaired by Martin Currie and Mayo Akele, event coordinator.


Back to events